Luxury Kitchen Remodeling in Los Angeles

Kitchen Remodeling Designed Around How You Live

A kitchen remodel is more than a visual upgrade. It is about creating a space that fits your lifestyle, daily routines, and long-term plans for your home. From modern family kitchens to high-end custom renovations, our design-build team delivers kitchens that look great, function better, and add real value to your property.

We Do Construction Los Angeles specializes in luxury kitchen remodels for clients in Brentwood, Pacific Palisades, Beverly Hills, and Sherman Oaks. Typical investment runs $150K to $500K, with completion in 4 to 8 months depending on scope. WDC’s kitchen scope covers structural reconfiguration (load-bearing wall removal, ceiling height changes, window expansions), full MEP replacement (gas line relocation, 60A circuit additions, sub-zero and steam plumbing), custom cabinetry sourced from millwork partners, natural stone and quartzite slab selection, and integrated appliance specification for Wolf, Sub-Zero, Gaggenau, and Miele. Principal Jacob Bachar oversees design through punch list. LADBS permits are pulled for any project involving structural moves, gas reroutes, or electrical service upgrades. Lead time from contract to permit issuance averages 8 to 16 weeks based on plan check load.

Who This Service Is For

Discovery phase icon — initial project assessment, We Do Construction Los Angeles.

Homeowners Planning to Stay Long-Term

You want a kitchen that works for everyday life, hosting, cooking, and family time, without constant compromises or future fixes.

Design phase icon — schematic and program development, We Do Construction Los Angeles.

Growing Families

You want a kitchen that works for everyday life, hosting, cooking, and family time, without constant compromises or future fixes.

Build phase icon — construction execution, We Do Construction Los Angeles.

Real Estate Investors

You want a kitchen that works for everyday life, hosting, cooking, and family time, without constant compromises or future fixes.

SIGNATURE MOMENTS

What separates a WDC kitchen from a renovation.

Workflow-first design

Every layout decision starts with how you actually use your kitchen — prep zones and storage positioned around your habits.

Hidden storage systems

Pull-outs, toe-kick drawers, and built-in organizers that eliminate clutter without sacrificing style.

Material integrity throughout

Same quality materials on surfaces you touch every day as on the surfaces you see. No shortcuts where it counts.

ENGAGEMENT MODEL

Three phases. One kitchen you'll never want to leave.

Flat-fee at every phase. You know the investment before work begins.

PHASE 01

Discovery

We assess your layout, plumbing, and electrical. You share how you cook and entertain — we design around that.

PHASE 02

Design

Full 3D renderings, material selections, and cabinetry layout. Every detail resolved before a cabinet is ordered.

PHASE 03

Construction

Demo, rough trades, cabinetry, countertops, tile, and final finish — one team, one timeline.

Custom KitchenDesign

Every kitchen starts with a layout tailored to your space, needs, and preferences. We focus on flow, storage, and usability before choosing finishes.

Cabinetry and Storage Solutions

Every kitchen starts with a layout tailored to your space, needs, and preferences. We focus on flow, storage, and usability before choosing finishes.

Countertops and Surfaces

Every kitchen starts with a layout tailored to your space, needs, and preferences. We focus on flow, storage, and usability before choosing finishes.

Lighting, Electrical, and Plumbing

Every kitchen starts with a layout tailored to your space, needs, and preferences. We focus on flow, storage, and usability before choosing finishes.

The Old Way

Our Design-Build Approach

Why Remodeling Your Kitchen Is Worth It

Discovery phase icon — initial project assessment, We Do Construction Los Angeles.

Increase Property Value

A well-designed kitchen remodel consistently delivers one of the highest returns on investment in residential construction.

Design phase icon — schematic and program development, We Do Construction Los Angeles.

Improve Daily Functionality

Better layouts, improved lighting, and modern appliances transform how the space is actually used.

Build phase icon — construction execution, We Do Construction Los Angeles.

Modernize the Look and Feel

Clean lines, updated finishes, and thoughtful design create a kitchen that feels current and timeless at the same time.

KITCHEN · LA

Two refrigerators, one wall, no compromise.

An LA kitchen is the room everyone uses and the room everyone judges. WDC builds for both — Wolf-Sub-Zero-La Cornue capacity, quarter-sawn cabinetry, full-trade construction under one LADBS permit.

Arched volume + palms + terra-cotta tile beyond — Beverly Hills kitchen register.
KITCHEN · LAArched volume + palms + terra-cotta tile beyond — Beverly Hills kitchen register.

PROCESS AT A GLANCE

One team. One timeline.

From first measurement to final walk-through, one point of contact.

STAGE 01

Discovery

1–2 weeks

Site visit, existing conditions, project scoping.

STAGE 02

Design

3–8 weeks

Layout, material selections, 3D renderings, cabinetry spec.

STAGE 03

Permit

2–6 weeks

Permit drawings, city submission, approvals.

STAGE 04

Build

6–14 weeks

Demo through final punch list. Your kitchen, complete.

Read the full process →

What to Expect During a Kitchen Remodel

Kitchen remodeling in Los Angeles often requires permits and inspections through local authorities. Our team handles the permitting process and ensures compliance with all relevant regulations.

Typical project timelines vary depending on scope, materials, and approvals, but we always provide realistic expectations upfront so there are no surprises.

What Impacts the Cost of a Kitchen Remodel

Professionals Tips

Increase Property Value

A well-designed kitchen remodel consistently delivers one of the highest returns on investment in residential construction.

Improve Daily Functionality

Better layouts, improved lighting, and modern appliances transform how the space is actually used.

Modernize the Look and Feel

Clean lines, updated finishes, and thoughtful design create a kitchen that feels current and timeless at the same time.

Increase Property Value

A well-designed kitchen remodel consistently delivers one of the highest returns on investment in residential construction.

Improve Daily Functionality

Better layouts, improved lighting, and modern appliances transform how the space is actually used.

Modernize the Look and Feel

Clean lines, updated finishes, and thoughtful design create a kitchen that feels current and timeless at the same time.

What Our Clients Say

5-star reviews — design-build clients of We Do Construction.

Over 150 five-star reviews

5-star reviews — design-build clients of We Do Construction.

Over 85 five-star reviews

5-star reviews — design-build clients of We Do Construction.

Over 20 five-star reviews

BBB accredited business badge for We Do Construction.

We Do Construction, Inc.

How we build faster Three differentiators
−6wk
vs standard timeline
Cabinets ordered before permits clear
We finalize selections and place cabinet orders during permit review — not after.
Timeline
3D
render before demo
Design preview before demo begins
You approve the full kitchen in 3D before a single cabinet is removed.
Design
5
days to rough-in
Demo and rough-in same week
Sequenced trades mean demo and rough-in run back-to-back — no idle days between phases.
Speed

FAQ

$150,000 to $500,000 in 2026 for the luxury tier. A refresh within the existing footprint with semi-custom cabinetry lands $150–225K. A reconfigure — wall down, custom millwork, integrated appliances — lands $225–350K. An architectural kitchen with structural work, full custom cabinetry, and a professional range lands $350–500K.

6 to 14 weeks of construction. Including design and permitting, kickoff to the first dinner runs 12 to 30 weeks. Cabinetry lead time, at 10 to 16 weeks, is the longest single line item, which is why we release the cabinet order before demolition begins.

Yes if any wall comes down, the island moves significantly, the panel needs upgrading, or the hood vent path changes. LADBS handles all of it, and we manage the filing, engineering coordination, and inspections. A cosmetic refresh that holds plumbing and electrical in place can sometimes proceed without a permit.

Usually, yes. We set up a temporary kitchen, seal the work zone with dust barriers, and schedule utility shutoffs in advance. The hard weeks are demolition and rough-in; most families stay in place for the full 6 to 14 weeks.

Yes. A first conversation is free and gives you a ballpark range for the scope you describe. A committed number comes out of Discovery — a fixed-fee feasibility phase that produces a written memo with zoning and setback summary, permit path, preliminary scope, and budget envelope. No design work begins until program and budget are agreed.

A dedicated WDC project manager, the same team from Discovery through final walkthrough. You receive a weekly site report and a monthly Owner-Architect-Contractor meeting. The team that designed the project is the team that builds it.